Crown has extensive experience and resources to develop water strategies and conduct preliminary and final engineering.
- Executive summary of available water management alternatives to include a spreadsheet comparing alternatives consisting of capital cost, O&M costs and the long-term potential for good results and compliance.
- Process Flow Diagram(s) representing the recommended scheme(s) and either a mass balance spreadsheet included in the flow diagram(s).
- Preliminary engineered cost estimate (installed basis) for the recommended strategy.
- O&M calculations and support documentation for the recommended treatment scheme.
- Footprint dimensions on recommended systems and assistance creating general arrangement layout drawings.
- General Arrangement Plan(s) of water management assets
- Motor lists and I/O estimates for control systems.
- Control Architecture Diagram (CAD).
- Drawings shall be provided in 3D AutoCAD or Adobe.
